Albion Hydro, LLC

December 13-14, 2022. Two turbine assemblies, nearly 25 tons each, lowered into place.
Location

Albion Hydro, LLC on the Blackstone River, Cumberland, Rhode Island

Type of waterway

Run-of-River

PRofile

Two Archimedes Screw Turbines (ASTs)

430 kW installed capacity

2034 MW hrs per year

‍

Start Date

Spring 2023